Skip to main content

About inspections

An inspection in Beacon is an internal quality visit to one nursery. The inspector walks round the nursery with a checklist, room by room, answers each item, takes photos, records temperature readings, notes maintenance problems and talks to staff. When the visit is finished they submit it, and it moves on to review and sign-off.

The Inspections page with numbered markers on the menu item, the search box, the Plan Inspection button, the Start Inspection button and the Planned section
The Inspections page groups visits by stage: planned, in progress, in review and signed off.

The stages of an inspection​

StageWhat it meansWhere you'll see it
PlannedA date has been pencilled in. Nothing has been inspected yet.The Planned section of the Inspections page, the dashboard and the calendar
In ProgressSomeone is on site answering the checklist.The In Progress section
In ReviewThe inspection has been submitted. A draft report exists and is being reviewed.The In Review section, with a status such as Review Required, Under Review, Awaiting Approval or Rework Required
Signed offAn area support manager has signed the report off. It's locked, and its PDFs and action plan are ready.The Signed off section, with the result, such as Pass · 86%

Review and sign-off are covered in Review and sign-off.

Who does what​

  • Area support managers plan visits, start and carry out inspections, review them and sign them off. They can also archive an inspection started by mistake.
  • Area support leads start and carry out inspections and review them, then send the report to an area support manager for approval.
  • The main inspector named on a visit can answer its checklist and submit it, whatever their role.
  • Read-only auditors can look at visits in progress and in review, but can't change anything.
  • Nursery managers, room leaders and maintenance managers don't see a visit until its report is signed off. Then they can read the report and work on the action plan.

Visit types​

Each inspection is one of five visit types. The type decides which checklist items are included, because every item in the template has a frequency.

Visit typeIncludes
Monthly VisitItems checked on every visit, plus the monthly items
Quarterly VisitEverything in a monthly visit, plus the quarterly items
Biannual VisitEverything in a quarterly visit, plus the six-monthly items
Annual VisitEverything in a biannual visit, plus the yearly items. The most thorough regular visit
Ad-hoc / Special VisitEvery item, whatever its frequency. For unscheduled visits, follow-ups after an incident or deep dives

How the score works​

Every checklist item has a weight. Beacon adds up the weights of the items marked Pass and divides by the weights of all the items marked Pass or Fail. Items marked N/A, and items left unanswered, don't count either way. The percentage gives the result:

ScoreResult
80% or morePass
50% to 79%Fail
Under 50%Immediate Action

While you're inspecting, the panel beside the checklist shows the Predicted outcome as you go.

Guides in this section​